Expert Tips for Reviewing Shop Drawings: A Comprehensive Guide


Expert Tips for Reviewing Shop Drawings: A Comprehensive Guide

Checking shop drawings is a critical step in the construction process, ensuring that the project is built according to the design intent. Shop drawings are detailed plans created by contractors and fabricators that show how a project will be constructed. They include information on materials, dimensions, and construction methods.

Checking shop drawings helps to identify any errors or omissions in the design, and ensures that the project is built to the required standards. It also helps to avoid costly delays and rework during construction.

There are a number of different ways to check shop drawings, but the most common method is to use a checklist. Checklists can be created by the architect, engineer, or contractor, and they typically include a list of items that need to be checked, such as:

  • Dimensions
  • Materials
  • Construction methods
  • Codes and standards

Once the checklist has been created, it can be used to review the shop drawings and identify any errors or omissions. If any errors are found, they should be corrected before the project is built.

Checking shop drawings is an important step in the construction process, and it helps to ensure that the project is built to the required standards and avoid costly delays and rework during construction.

1. Accuracy

Accuracy is one of the most important aspects of shop drawings. Inaccurate shop drawings can lead to errors in construction, which can be costly and time-consuming to correct. In some cases, inaccurate shop drawings can even lead to safety hazards.

There are a number of ways to check the accuracy of shop drawings. One way is to compare the shop drawings to the design drawings. Another way is to check the shop drawings for compliance with applicable codes and standards. It is also important to review the shop drawings for constructability, to ensure that they can be built in a safe and efficient manner.

Checking the accuracy of shop drawings is an important part of the construction process. By ensuring that shop drawings are accurate, architects, engineers, and contractors can help to avoid errors in construction and ensure that the project is built to the required standards.

Here are some real-life examples of the importance of accuracy in shop drawings:

  • In one case, a contractor used inaccurate shop drawings to build a steel frame for a building. The errors in the shop drawings caused the steel frame to be misaligned, which led to delays and additional costs to correct the errors.
  • In another case, a contractor used shop drawings that did not comply with the applicable building code. This resulted in the building failing to pass inspection, which caused the contractor to lose money and time.

These examples illustrate the importance of accuracy in shop drawings. By checking the accuracy of shop drawings, architects, engineers, and contractors can help to avoid costly errors and ensure that the project is built to the required standards.

2. Coordination

Coordination is essential in the construction process, as it ensures that all elements of a project fit together properly. Shop drawings play a critical role in coordination, as they provide detailed information on how a project will be constructed. By coordinating shop drawings with other project documents, such as the architectural drawings and structural calculations, architects, engineers, and contractors can help to avoid errors and ensure that the project is built to the required standards.

  • Facet 1: Clash Detection

    One of the most important aspects of coordination is clash detection. Clash detection is the process of identifying and resolving conflicts between different elements of a project. For example, a clash might occur if a duct is routed through a space that is already occupied by a structural beam. By coordinating shop drawings with other project documents, architects, engineers, and contractors can identify and resolve clashes early in the design process, before they become costly and time-consuming to correct.

  • Facet 2: Constructability Review

    Another important aspect of coordination is constructability review. Constructability review is the process of assessing whether a project can be built in a safe and efficient manner. By coordinating shop drawings with other project documents, architects, engineers, and contractors can identify any potential constructability issues early in the design process. This can help to avoid costly delays and rework during construction.

  • Facet 3: Code Compliance

    Finally, coordination is essential for ensuring that a project complies with all applicable codes and standards. By coordinating shop drawings with other project documents, architects, engineers, and contractors can identify any potential code violations early in the design process. This can help to avoid costly delays and rework during construction.

By coordinating shop drawings with other project documents, architects, engineers, and contractors can help to ensure that a project is built to the required standards and avoid costly delays and rework during construction.

3. Constructability

Constructability is a critical aspect of shop drawings, as it ensures that a project can be built in a safe and efficient manner. By checking shop drawings for constructability, architects, engineers, and contractors can identify any potential problems early in the design process, before they become costly and time-consuming to correct.

  • Facet 1: Buildability

    Buildability is the ability to construct a project according to the design intent. When checking shop drawings for buildability, architects, engineers, and contractors should consider factors such as the availability of materials and labor, the sequencing of construction activities, and the safety of the construction process.

  • Facet 2: Efficiency

    Efficiency is the ability to construct a project in a timely and cost-effective manner. When checking shop drawings for efficiency, architects, engineers, and contractors should consider factors such as the use of prefabrication and modular construction, the optimization of material usage, and the reduction of waste.

  • Facet 3: Safety

    Safety is the ability to construct a project without causing harm to workers or the public. When checking shop drawings for safety, architects, engineers, and contractors should consider factors such as the use of fall protection, the proper handling of hazardous materials, and the provision of adequate lighting and ventilation.

  • Facet 4: Sustainability

    Sustainability is the ability to construct a project in a way that minimizes environmental impact. When checking shop drawings for sustainability, architects, engineers, and contractors should consider factors such as the use of recycled materials, the reduction of energy consumption, and the protection of natural resources.

By checking shop drawings for constructability, architects, engineers, and contractors can help to ensure that a project is built in a safe, efficient, and sustainable manner.

4. Compliance

Compliance with codes and standards is a critical aspect of shop drawing review, as it ensures that the project is built to the required standards and is safe for occupancy. Codes and standards are developed by experts in the field to ensure that buildings are constructed in a safe and efficient manner. By checking shop drawings for compliance with codes and standards, architects, engineers, and contractors can help to avoid costly delays and rework during construction.

  • Facet 1: Building Codes

    Building codes are regulations that govern the design, construction, and alteration of buildings. Building codes are developed by local governments and are based on the International Building Code (IBC). The IBC is a model code that is used by most states and municipalities in the United States. Building codes cover a wide range of topics, including structural safety, fire safety, and accessibility. When checking shop drawings for compliance with building codes, architects, engineers, and contractors should consider factors such as:

    • Structural safety: Shop drawings must be checked to ensure that the building will be able to withstand the loads that it will be subjected to, such as dead loads, live loads, and wind loads.
    • Fire safety: Shop drawings must be checked to ensure that the building will be able to resist the spread of fire and smoke. This includes checking for the use of fire-resistant materials and the provision of firestopping.
    • Accessibility: Shop drawings must be checked to ensure that the building will be accessible to people with disabilities. This includes checking for the provision of ramps, elevators, and accessible restrooms.
  • Facet 2: Electrical Codes

    Electrical codes are regulations that govern the design, installation, and maintenance of electrical systems. Electrical codes are developed by local governments and are based on the National Electrical Code (NEC). The NEC is a model code that is used by most states and municipalities in the United States. Electrical codes cover a wide range of topics, including wiring methods, overcurrent protection, and grounding. When checking shop drawings for compliance with electrical codes, architects, engineers, and contractors should consider factors such as:

    • Wiring methods: Shop drawings must be checked to ensure that the electrical wiring will be installed in a safe and workmanlike manner. This includes checking for the use of proper wire sizes and types, and the proper installation of electrical boxes and conduits.
    • Overcurrent protection: Shop drawings must be checked to ensure that the electrical system will be protected from overcurrents. This includes checking for the proper sizing and installation of circuit breakers and fuses.
    • Grounding: Shop drawings must be checked to ensure that the electrical system will be properly grounded. This includes checking for the proper installation of grounding electrodes and grounding conductors.

By checking shop drawings for compliance with codes and standards, architects, engineers, and contractors can help to ensure that the project is built to the required standards and is safe for occupancy.

FAQs on How to Check Shop Drawings

Checking shop drawings is an important part of the construction process, as it helps to ensure that the project is built according to the design intent and meets all applicable codes and standards. Here are some frequently asked questions about how to check shop drawings:

Question 1: What are the key aspects to check when reviewing shop drawings?

When checking shop drawings, it is important to focus on four key aspects: accuracy, coordination, constructability, and compliance.

Question 2: Why is accuracy important in shop drawings?

Accuracy is important in shop drawings because it helps to ensure that the project is built according to the design intent. Inaccurate shop drawings can lead to errors in construction, which can be costly and time-consuming to correct.

Question 3: How can I check the coordination of shop drawings?

To check the coordination of shop drawings, compare them to other project documents, such as the architectural drawings and structural calculations. This will help to identify any potential conflicts between different elements of the project.

Question 4: What is the purpose of constructability review in shop drawing checking?

Constructability review is the process of assessing whether a project can be built in a safe and efficient manner. By conducting constructability review, potential problems can be identified early in the design process, before they become costly and time-consuming to correct.

Question 5: Why is it important to check shop drawings for compliance with codes and standards?

Checking shop drawings for compliance with codes and standards is important to ensure that the project is built to the required standards and is safe for occupancy. Codes and standards are developed by experts in the field to ensure that buildings are constructed in a safe and efficient manner.

By understanding the importance of these key aspects and following best practices when checking shop drawings, architects, engineers, and contractors can help to ensure that construction projects are completed on time, within budget, and to the required standards.

Transition to the next article section: Importance of Communication in Construction Projects

Tips for Checking Shop Drawings

Checking shop drawings is a critical step in the construction process, as it helps to ensure that the project is built according to the design intent and meets all applicable codes and standards. Here are five tips for checking shop drawings:

Tip 1: Establish a clear review process.

Before beginning the review process, it is important to establish a clear process that outlines the steps involved, the roles and responsibilities of each team member, and the timeline for completion. This will help to ensure that the review process is efficient and effective.

Tip 2: Use a checklist.

Using a checklist can help to ensure that all of the important aspects of the shop drawings are reviewed. Checklists can be created by the architect, engineer, or contractor, and should include items such as:

  • Dimensions
  • Materials
  • Construction methods
  • Codes and standards

Tip 3: Coordinate with other project documents.

Shop drawings should be coordinated with other project documents, such as the architectural drawings and structural calculations, to ensure that all elements of the project fit together properly. This will help to avoid errors and ensure that the project is built to the required standards.

Tip 4: Consider constructability.

When checking shop drawings, it is important to consider whether the project can be built in a safe and efficient manner. This includes factors such as the availability of materials and labor, the sequencing of construction activities, and the safety of the construction process.

Tip 5: Check for compliance with codes and standards.

Shop drawings must comply with all applicable codes and standards, such as the International Building Code and the National Electrical Code. This will help to ensure that the project is built to the required standards and is safe for occupancy.

Summary of key takeaways:

  • Establishing a clear review process can help to ensure that the review process is efficient and effective.
  • Using a checklist can help to ensure that all of the important aspects of the shop drawings are reviewed.
  • Coordinating shop drawings with other project documents can help to avoid errors and ensure that the project is built to the required standards.
  • Considering constructability can help to avoid costly delays and rework during construction.
  • Checking for compliance with codes and standards can help to ensure that the project is built to the required standards and is safe for occupancy.

Transition to the article’s conclusion:

By following these tips, architects, engineers, and contractors can help to ensure that shop drawings are accurate, coordinated, constructible, and compliant with codes and standards. This will help to avoid costly errors and delays during construction and ensure that the project is completed on time, within budget, and to the required standards.

Closing Remarks on Checking Shop Drawings

Checking shop drawings is a crucial step in the construction process, ensuring that the project is built according to the design intent and meets all applicable codes and standards. By following best practices and using the tips outlined in this article, architects, engineers, and contractors can help to avoid costly errors and delays during construction, ensuring that the project is completed on time, within budget, and to the required standards.

It is important to remember that checking shop drawings is not just about finding errors, but also about ensuring that the project is constructible, coordinated, and compliant with codes and standards. By taking a proactive approach to shop drawing review, project teams can help to mitigate risks and ensure a successful project outcome.

As the construction industry continues to evolve, the importance of shop drawing review will only increase. With the advent of new technologies and materials, it is more important than ever to ensure that shop drawings are accurate, coordinated, and constructible. By embracing best practices and leveraging technology, project teams can improve the efficiency and effectiveness of shop drawing review, contributing to the successful delivery of construction projects.

Leave a Comment